Sierra Madre de Chiapas-Peten Foldbelt

Outline

Key Indicators
‍

Rating
‍

BB±

Ranking
‍

38

Outlook
‍

Neutral

Commentary

The USGS's 2024 assessment confirms material undiscovered oil and gas, but access is constrained on both sides of the border. On the Guatemalan side, the Xan field has been shut since August 2025 and the state is funding the closure of its wells, removing the basin's main producing operation. The Chiapas side is now the main entry route, but mixed-contract awards have so far gone to fields in Tabasco, Veracruz and the north-east rather than Chiapas; the 2026 USMCA review is an added risk. Outlook: Neutral.

Updated

October 12, 2026

Outline

Region
‍

Americas - Central

Position
‍

Onshore

Hydrocarbon
‍

Oil

Location

Sierra Madre de Chiapas-Peten Foldbelt

Description

The Sierra Madre de Chiapas–Petén Foldbelt (USGS Province 5310) extends from Chiapas in south-east Mexico into the Petén of northern Guatemala and, in the USGS's 2024 assessment of Mexico, Belize and Guatemala, comprises the NW–SE-trending Sierra Madre de Chiapas Fold Belt and its foreland, the Petén Basin. It lies north of the crystalline Chiapas Massif (Province 5311), and the Southern Petén Basin lies south of the Yucatán Platform. Deformation began with subduction of the Farallon plate in the Late Cretaceous–Eocene, and Miocene subduction of the Cocos plate formed the present fold belt and foreland basin. The fill is dominated by Mesozoic platform carbonates and evaporites, with up to 5,000 m of Cretaceous shallow-marine carbonates and evaporites and thin organic-rich pelagic limestones in the Southern Petén Basin, overlain by Eocene foredeep deposits of the Petén Group. Producing reservoirs are the Albian Cobán C and Cenomanian Cobán B carbonates at fields such as Rubelsanto and Chinajá, while fractured carbonates in structural traps and Miocene–Pliocene sandstones provide further targets.

Summary

The USGS's 2024 assessment gives the Sierra Madre de Chiapas–Petén Fold Belt and Basin Reservoirs AU mean undiscovered resources of 494 MMBO and 5,134 bcf of non-associated gas, plus 395 bcf of associated gas and about 115 MMBNGL. On the Guatemalan side, the Xan field in Petén, whose contract covered around 80% of national crude output, stopped producing on 13 August 2025 when Perenco's contract 2-85 expired and its 59 wells and facilities returned to the state. The state is expected to bear a closure cost of about US$50 million, and the 2026 budget allocates Q148.4 million for the technical closure, which the Ministry of Energy and Mines will put out to tender. On the Chiapas side, Pemex's mixed contracts have so far gone to fields in Tabasco, Veracruz and the north-east rather than Chiapas.

Source: ESRI, BGS, USGS & OGA data

© 2024 Oil & Gas Advisors Limited
Website by Rugby Web Design